Guide prices
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering SM4 and neighbouring districts
Distance is rarely the deciding factor. A roof in Mitcham, 1 mile from Morden, gets the same survey, the same written quote and the same fitting process as one in SM4, SW20 and SW19. What changes the price is the job itself: size of unit, roof type, access and lifting. Wimbledon, around 2 miles out, is treated the same way.
On the day, we cover
- Commissioning and sign-off carried out by the specialist before handover
- New vent fitted, sealed and weathered into the roof
- Certified vent and actuator matched to the opening and controls
- Free area at the stair head — We check the free area the vent must provide before choosing a replacement.
- Upstand and weathering — We check the upstand suits the new vent and that the roof around it is sound.
A typical installation day
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a smoke vent rooflight: one to two days per vent, weather permitting.
Planning, building control and Morden
A replacement smoke vent in England has to keep the free area and performance the building's fire strategy relies on, using a vent certified to BS EN 12101-2 with its actuator and backup power. We fit the vent and do the roof work; a smoke-control specialist connects and commissions the controls, and we confirm whether building control needs to be notified.
Getting a price from photos
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around SM4 and we will come back with a quote or a survey date.
Common questions in Morden
Does commercial rooflight work need building control?
Usually. New openings, structural changes and smoke vents go through building control, and on buildings covered by fire safety law that means a full plans application rather than a building notice. We are not registered with a competent person scheme, so replacements we fit are notified to building control. We confirm the route and show any fee on the quote.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Questions before you commit? Send them over with your Morden postcode and we will answer them plainly, with a quote alongside.