Guide prices in Glasgow
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Areas around Glasgow we cover
Distance is rarely the deciding factor. A roof in Rutherglen, 3 miles from Glasgow, gets the same survey, the same written quote and the same fitting process as one in G2, G4 and G1. What changes the price is the job itself: size of unit, roof type, access and lifting. Bishopbriggs, around 3 miles out, is treated the same way.
What we do on the day
- Old vent removed with the stairwell kept protected below
- Commissioning and sign-off carried out by the specialist before handover
- Certified vent and actuator matched to the opening and controls
- Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
- Controls and backup power — We confirm the controls, detection and backup power are being dealt with by a specialist.
How a fitting day runs
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a smoke vent rooflight: one to two days per vent, weather permitting.
Planning, building warrants and Glasgow
A smoke vent replacement in Scotland has to match the certified performance the building relies on, with controls commissioned by a specialist. Whether a building warrant is needed depends on the work, and we confirm it before quoting.
What to send for a quick quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, G2 or nearby, confirms travel.
Common questions in Glasgow
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Do you cover Glasgow?
Yes. Fitters travel to addresses in Glasgow and the surrounding districts, including G2. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Do commercial rooflights need planning permission?
Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.
Questions before you commit? Send them over with your Glasgow postcode and we will answer them plainly, with a quote alongside.

