Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Lower Earley · RG6 · Berkshire

Smoke vent rooflight installation in Lower Earley

Builders and extension firms in Lower Earley often want the rooflight stage of a project handled by a specialist fitting team. We step in once the roof deck or battens are ready, fit a smoke vent rooflight on your upstand or ours, detail it into the membrane or tiles, and leave the opening ready for the plasterer. Homeowners get exactly the same service directly. In each case the job is quoted in writing first, with any access or lifting needs spelt out. Jobs around RG6 and the neighbouring districts are welcome.

Guide price from £3,595 · Supply & fit; controls and commissioning by a smoke-control specialist

What the job costs in Lower Earley

Vent swap

£3,595 – £6,595including VAT at 20%

Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist

Vent with new controls

£5,745 – £9,595including VAT at 20%

Vent plus new control panel and detection, commissioned by a smoke-control specialist

Multiple vents

£9,595 – £17,995including VAT at 20%

Several stairwells or larger systems, priced from a survey

Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Our fitters come to you. For Lower Earley that covers RG6, RG2 and RG5, plus nearby Reading and Wokingham. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.

Included in the work

  • Existing vent, actuator and upstand surveyed with the specialist
  • New vent fitted, sealed and weathered into the roof
  • Certified vent and actuator matched to the opening and controls
  • Free area at the stair head — We check the free area the vent must provide before choosing a replacement.
  • Controls and backup power — We confirm the controls, detection and backup power are being dealt with by a specialist.

From arrival to clean-up

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a smoke vent rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Regulations for Lower Earley properties

In England, smoke vents for common stairs must be certified to BS EN 12101-2, provide the free area the fire strategy requires (Approved Document B calls for at least 1 m² at the top of a common stair), and have backup power. Smoke vents have their own energy limit, commonly 3.5 W/m²K. Controls and commissioning are handled by a smoke-control specialist, and building control is involved where the system changes.

Getting a price from photos

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, RG6 or nearby, confirms travel.

Common questions in Lower Earley

What upstand height and roof pitch does smoke vent rooflight fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

What if my roof opening is the wrong size for the smoke vent rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Does commercial rooflight work need building control?

Usually. New openings, structural changes and smoke vents go through building control, and on buildings covered by fire safety law that means a full plans application rather than a building notice. We are not registered with a competent person scheme, so replacements we fit are notified to building control. We confirm the route and show any fee on the quote.

For a free, no-obligation quote in Lower Earley, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Smoke vents (AOV) in Lower Earley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote