Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Hedge End · SO30 · Hampshire

Sliding rooflight installation in Hedge End

A rooflight is not finished when the roof is watertight. The inside matters too: the reveal or lining around the opening, the plaster, the trim where it meets the ceiling. Some installers leave that for somebody else. When we quote for sliding rooflight installation in Hedge End, internal finishing is listed so you can see whether it is included or left for your decorator. That way a sliding rooflight looks right from the room below as well as from outside. We cover Hedge End and properties throughout Hampshire.

Guide price from £7,795 · Supply & fit

Guide prices

Compact sliding

£7,795 – £10,795including VAT at 20%

Motorised sliding unit for a stair or hatch opening

Standard sliding

£10,795 – £15,595including VAT at 20%

Larger opening onto a roof terrace

Large sliding

£15,595 – £22,795including VAT at 20%

Big spans, lifting gear and longer installs

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Coverage in and around Hedge End

Covering Hedge End means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in SO30, SO19 and SO18, and are happy to quote further out in Bishopstoke and Eastleigh. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.

Already bought your unit?

Your unit or ours, the fitting standard is the same. For supply and fit we choose a sliding rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.

Included in the work

  • Clear run confirmed for the glass to slide over when open
  • Upstand checked for strength, square and level along its full length
  • Cable routed to the motor, ready for the electrician's final connection, quoted as a separate line
  • What the glass slides over — We check the area the glass will cover when open before deciding where the unit goes.
  • Power and safety stops — We confirm the power supply and the safety features before fitting day.

What happens on the day

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a sliding rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days.

Do you need permission in Hedge End?

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Help us quote accurately

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around SO30 and we will come back with a quote or a survey date.

Common questions in Hedge End

Will my new sliding rooflight leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Tell us your postcode, SO30 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sliding rooflights in Hedge End

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote