Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Southall · UB1 · Greater London

Sliding rooflight installation in Southall

Plenty of rooflight trouble starts with a tape measure. Units are often sold by the builder's opening, meaning the hole in the roof, rather than the overall external size, and confusing the two leaves you with a frame that does not suit the opening. Before we fit any sliding rooflight in Southall, we measure the opening, the upstand or kerb where there is one, and the finished roof level, then compare them with the maker's drawing. If something is out, you hear about it before the fitting day rather than on it. That single check keeps most jobs like this on track.

Guide price from £7,795 · Supply & fit

Guide prices

Compact sliding

£7,795 – £10,795including VAT at 20%

Motorised sliding unit for a stair or hatch opening

Standard sliding

£10,795 – £15,595including VAT at 20%

Larger opening onto a roof terrace

Large sliding

£15,595 – £22,795including VAT at 20%

Big spans, lifting gear and longer installs

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

If you also own a property or a business unit in Greenford, Heston or West Ealing, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and UB1, UB2 and W7 sit comfortably within that pattern.

Fit-only or supply and fit

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

What the job includes

  • Cable routed to the motor, ready for the electrician's final connection, quoted as a separate line
  • Frame fixed and weathered with the membrane dressed up the kerb
  • Controls, sensors and any safety stop set up and tested
  • Guarding on the terrace — We look at how the roof terrace will be guarded before the rooflight is fitted.
  • Weight and lifting — We plan the lift for a sliding rooflight before it is ordered.

What happens on the day

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a sliding rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days.

Do you need permission in Southall?

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

What to send for a quick quote

Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in UB1, and we can price it.

Common questions in Southall

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

Can you replace an old dome without redoing the whole roof?

Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.

Planning a sliding rooflight in Southall? Tell us about the roof and we will come back with a clear price in writing.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sliding rooflights in Southall

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote