Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Bromley · BR1 · Greater London

Sliding rooflight installation in Bromley

Plenty of rooflight trouble starts with a tape measure. Units are often sold by the builder's opening, meaning the hole in the roof, rather than the overall external size, and confusing the two leaves you with a frame that does not suit the opening. Before we fit any sliding rooflight in Bromley, we measure the opening, the upstand or kerb where there is one, and the finished roof level, then compare them with the maker's drawing. If something is out, you hear about it before the fitting day rather than on it. That single check keeps most jobs like this on track.

Guide price from £7,795 · Supply & fit

Guide prices

Compact sliding

£7,795 – £10,795including VAT at 20%

Motorised sliding unit for a stair or hatch opening

Standard sliding

£10,795 – £15,595including VAT at 20%

Larger opening onto a roof terrace

Large sliding

£15,595 – £22,795including VAT at 20%

Big spans, lifting gear and longer installs

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across Bromley and nearby

Our fitters come to you. For Bromley that covers BR1, BR2 and BR3, plus nearby Beckenham and Chislehurst. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.

Fit-only or supply and fit

There are two ways to do this. Supply and fit means we source a sliding rooflight that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.

On the day, we cover

  • Full open and close cycle checked before handover
  • Lifting plan for the unit, often with gear booked for the day
  • Clear run confirmed for the glass to slide over when open
  • Planning for a roof terrace — We flag early whether planning may be needed for the work around the rooflight.
  • Power and safety stops — We confirm the power supply and the safety features before fitting day.

Fitting your sliding rooflight, step by step

On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a sliding rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.

Do you need permission in Bromley?

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Getting a price from photos

Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around BR1. That is enough for a first price.

Common questions in Bromley

Can you replace an old dome without redoing the whole roof?

Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Do I need planning permission for a rooflight in Bromley?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

Questions before you commit? Send them over with your Bromley postcode and we will answer them plainly, with a quote alongside.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sliding rooflights in Bromley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote