Guide prices in Hawarden
Compact sliding
Motorised sliding unit for a stair or hatch opening
Standard sliding
Larger opening onto a roof terrace
Large sliding
Big spans, lifting gear and longer installs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Hawarden we cover
Fitters travel to the job, so the address is what counts. In Hawarden that means postcode districts CH5, CH4 and CH7, and the same teams can just as easily take on work in Deeside, about 1 mile away, or Buckley at roughly 3 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Fit-only or supply and fit
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a sliding rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
What the job includes
- Frame fixed and weathered with the membrane dressed up the kerb
- Controls, sensors and any safety stop set up and tested
- Upstand checked for strength, square and level along its full length
- Power and safety stops — We confirm the power supply and the safety features before fitting day.
- Planning for a roof terrace — We flag early whether planning may be needed for the work around the rooflight.
What happens on the day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a sliding rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days.
Planning and building rules in Wales
Wales sets energy limits of 2.2 W/m²K for rooflights and 1.4 W/m²K for roof windows, and new rooflight openings generally need building regulations approval. Replacement units are controlled fittings; we are not registered with a competent person scheme, so ours are covered by a building notice to the council. Planning permission is needed for rooflights in conservation areas, National Parks, AONBs and World Heritage Sites. We check which applies and include the fee in your quote.
Help us quote accurately
For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as CH5.
Common questions in Hawarden
What if my roof opening is the wrong size for the sliding rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
Can you fit the sliding rooflight I bought online?
Yes, fit-only is one of our core services. Send the product link or spec, photos of the roof and rough sizes, and we can usually price it from those. Before fitting we check the delivery for damage, which should be reported to the seller, plus the size against the builder's opening and the upstand height. The product warranty stays with the maker or seller, and our guarantee covers the fitting.
How long does fitting take?
Fitting a sliding rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Questions before you commit? Send them over with your Hawarden postcode and we will answer them plainly, with a quote alongside.