Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Nantwich · CW5 · Cheshire

Sliding rooflight installation in Nantwich

Plenty of rooflight trouble starts with a tape measure. Units are often sold by the builder's opening, meaning the hole in the roof, rather than the overall external size, and confusing the two leaves you with a frame that does not suit the opening. Before we fit any sliding rooflight in Nantwich, we measure the opening, the upstand or kerb where there is one, and the finished roof level, then compare them with the maker's drawing. If something is out, you hear about it before the fitting day rather than on it. That single check keeps most jobs like this on track.

Guide price from £7,795 · Supply & fit

Guide prices in Nantwich

Compact sliding

£7,795 – £10,795including VAT at 20%

Motorised sliding unit for a stair or hatch opening

Standard sliding

£10,795 – £15,595including VAT at 20%

Larger opening onto a roof terrace

Large sliding

£15,595 – £22,795including VAT at 20%

Big spans, lifting gear and longer installs

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Covering Nantwich means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in CW5, CW2 and CW1, and are happy to quote further out in Crewe and Sandbach. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.

Fit-only or supply and fit

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

On the day, we cover

  • Upstand checked for strength, square and level along its full length
  • Lifting plan for the unit, often with gear booked for the day
  • Full open and close cycle checked before handover
  • Weight and lifting — We plan the lift for a sliding rooflight before it is ordered.
  • What the glass slides over — We check the area the glass will cover when open before deciding where the unit goes.

From arrival to clean-up

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a sliding rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days.

Planning and building rules in England

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Help us quote accurately

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, CW5 or nearby, confirms travel.

Common questions in Nantwich

Do I need planning permission for a rooflight in Nantwich?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Can you fit the sliding rooflight I bought online?

Yes, fit-only is one of our core services. Send the product link or spec, photos of the roof and rough sizes, and we can usually price it from those. Before fitting we check the delivery for damage, which should be reported to the seller, plus the size against the builder's opening and the upstand height. The product warranty stays with the maker or seller, and our guarantee covers the fitting.

Get in touch with the details of your Nantwich property and we will explain what the job involves and what it costs.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sliding rooflights in Nantwich

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote