Guide prices
Compact sliding
Motorised sliding unit for a stair or hatch opening
Standard sliding
Larger opening onto a roof terrace
Large sliding
Big spans, lifting gear and longer installs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Great Sankey
Covering Great Sankey means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in WA5, WA2 and WA1, and are happy to quote further out in Warrington and Newton-le-Willows. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
Your sliding rooflights or ours
Your unit or ours, the fitting standard is the same. For supply and fit we choose a sliding rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What we do on the day
- Clear run confirmed for the glass to slide over when open
- Frame fixed and weathered with the membrane dressed up the kerb
- Full open and close cycle checked before handover
- Power and safety stops — We confirm the power supply and the safety features before fitting day.
- Planning for a roof terrace — We flag early whether planning may be needed for the work around the rooflight.
A typical installation day
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a sliding rooflight: one to two days, weather permitting.
Planning and building rules in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Getting a price from photos
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around WA5. That is enough for a first price.
Common questions in Great Sankey
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
What upstand height and roof pitch does sliding rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Ask for a quote for your Great Sankey roof. Survey dates are offered based on fitter availability once you are happy with the price.