Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Sandhurst · GU47 · Berkshire

Sliding rooflight installation in Sandhurst

Sliding rooflight installation in Sandhurst comes down to what happens around the glass. A good unit sat on a poor upstand, or with the membrane or flashing cut short at the corners, will still let water in. We fit each sliding rooflight to the maker's instructions for fixings, packers and sealant, for homes and businesses across Sandhurst and the rest of Berkshire. That covers supply and fit, fit-only for a unit you already own, and swapping out a tired one. Every job starts with a written quote, so the price and scope are clear before anyone climbs a ladder.

Guide price from £7,795 · Supply & fit

Sandhurst guide prices

Compact sliding

£7,795 – £10,795including VAT at 20%

Motorised sliding unit for a stair or hatch opening

Standard sliding

£10,795 – £15,595including VAT at 20%

Larger opening onto a roof terrace

Large sliding

£15,595 – £22,795including VAT at 20%

Big spans, lifting gear and longer installs

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Sandhurst and the districts around it, GU47, RG45 and RG40, all sit inside our working area. So does the ground between Sandhurst and Crowthorne (2 miles), and on towards Yateley (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

What we check on a supplied unit

If you have bought a sliding rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.

On the day, we cover

  • Controls, sensors and any safety stop set up and tested
  • Clear run confirmed for the glass to slide over when open
  • Cable routed to the motor, ready for the electrician's final connection, quoted as a separate line
  • What the glass slides over — We check the area the glass will cover when open before deciding where the unit goes.
  • Power and safety stops — We confirm the power supply and the safety features before fitting day.

What happens on the day

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a sliding rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Regulations for Sandhurst properties

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Getting a price from photos

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, GU47 or nearby, confirms travel.

Common questions in Sandhurst

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Do you offer trade rates for builders and roofers?

We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Ask for a quote for your Sandhurst roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sliding rooflights in Sandhurst

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote