What the job costs in Belfast
Like-for-like swap
Old dome or unit removed and disposed of, new glass rooflight fitted to the existing sound kerb
New upstand and swap
Old kerb taken off, new insulated upstand built, roof covering made good, new unit fitted
Opening or large unit
Electric or larger replacement, including making good inside
Guide ranges for supply & fit; building control notice fee extra in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Belfast we cover
Distance is rarely the deciding factor. A roof in Castlereagh, 2 miles from Belfast, gets the same survey, the same written quote and the same fitting process as one in BT1, BT2 and BT7. What changes the price is the job itself: size of unit, roof type, access and lifting. Newtownabbey, around 4 miles out, is treated the same way.
What we check on a supplied unit
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a replacement rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
What we do on the day
- Internal reveal made good where the old trim or plaster was damaged
- New unit bedded, fixed and sealed exactly as its maker shows
- Old rooflight or dome unscrewed, lifted out and taken away for disposal
- Dome to glass upgrades — We check that the opening and kerb suit a flat glass unit before quoting a dome-to-glass swap.
- Leaks that are not the rooflight — We look at the roof around the unit before blaming the rooflight.
How a fitting day runs
Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a replacement rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning and building rules in Northern Ireland
Northern Ireland has its own rules. Permitted development for rooflights on a house requires the unit to sit below the highest part of the roof, project no more than 15 cm where the slope faces a road, and stay at least half a metre from the ridge, eaves, party wall and verge. It doesn't apply in conservation areas or within the grounds of a listed building. For building control, structural roof alterations need an application, and rooflights must meet WER Band C or 1.6 W/m²K.
Before you get in touch
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, BT1 or nearby, confirms travel.
Common questions in Belfast
What upstand height and roof pitch does replacement rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Get in touch with the details of your Belfast property and we will explain what the job involves and what it costs.