What the job costs in Maidenhead
Like-for-like swap
Old dome or unit removed and disposed of, new glass rooflight fitted to the existing sound kerb
New upstand and swap
Old kerb taken off, new insulated upstand built, roof covering made good, new unit fitted
Opening or large unit
Electric or larger replacement, including making good inside
Guide ranges for supply & fit; building control notice fee extra in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering SL6 and neighbouring districts
Distance is rarely the deciding factor. A roof in Marlow, 4 miles from Maidenhead, gets the same survey, the same written quote and the same fitting process as one in SL6, SL1 and SL2. What changes the price is the job itself: size of unit, roof type, access and lifting. Slough, around 5 miles out, is treated the same way.
Fit-only or supply and fit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a replacement rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
What we do on the day
- Old rooflight or dome unscrewed, lifted out and taken away for disposal
- Building notice given to the council in England and Wales, with its fee on the quote
- Roof membrane repaired and turned up where it meets the kerb
- Inside finishes — We check the condition of the plaster and trim around the opening from inside.
- Leaks that are not the rooflight — We look at the roof around the unit before blaming the rooflight.
What happens on the day
Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a replacement rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning and building rules in England
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
Help us quote accurately
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, SL6 or nearby, confirms travel.
Common questions in Maidenhead
Do I need planning permission for a rooflight in Maidenhead?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.