Guide prices in Trowbridge
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Trowbridge we cover
Distance is rarely the deciding factor. A roof in Westbury, 4 miles from Trowbridge, gets the same survey, the same written quote and the same fitting process as one in BA14, BA15 and BA13. What changes the price is the job itself: size of unit, roof type, access and lifting. Melksham, around 5 miles out, is treated the same way.
What the job includes
- Sealed unit ordered to match or improve on the original glass
- New glazing tapes, gaskets or sealant fitted to suit the frame
- New unit set on packers, then beaded, capped or bonded as designed
- Condition of the frame — We look at the frame closely before committing to new glass.
- Matching the glass make-up — We identify the existing glass so the replacement performs at least as well.
How the glass is replaced
The second visit is the quick one. With the new unit made to size, the fitters take the old glass out, check the frame and drainage paths, and set the new glass on packers so it sits square and drains properly. Seals and cappings are renewed where needed, the area is cleared, and you are shown what was done.
Planning, building control and Trowbridge
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
What to send us
Photos of the problem glass from inside and out, a rough width and length, and whether the rooflight opens or is fixed are enough to price the first visit. Add the postcode and how the roof is reached, and tell us if more than one unit has misted.
Common questions in Trowbridge
Can you replace just the glass in my rooflight?
Often, yes. If the frame, gaskets and drainage are sound, a new sealed unit can go into the existing frame. If the frame has failed, is distorted or leaks around the edge, replacing the whole rooflight is usually the better answer, and we tell you that.
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.
For a repair in Trowbridge, start with photos and the postcode; we confirm the visit price before anything is booked.