Guide prices in Warwickshire
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Warwickshire
We work right across England, and Warwickshire is covered on the same footing as everywhere else. There is no showroom or depot to visit. The survey happens at your property or, for fit-only jobs, from your photos. If your address is remote or reached by ferry, tell us early and we will confirm what arrangement is needed before quoting.
- Glass replacement in Bedworth
- Glass replacement in Kenilworth
- Glass replacement in Leamington Spa
- Glass replacement in Nuneaton
- Glass replacement in Rugby
- Glass replacement in Stratford-upon-Avon
- Glass replacement in Warwick
What we do on the day
- Measuring visit to size the glass and identify its make-up
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- Sealed unit ordered to match or improve on the original glass
- Condition of the frame — We look at the frame closely before committing to new glass.
- Can the glass come out? — We check whether your rooflight has removable glass or a bonded unit before booking a fitting visit.
Rules that apply in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Common questions in Warwickshire
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.
Can you replace just the glass in my rooflight?
Often, yes. If the frame, gaskets and drainage are sound, a new sealed unit can go into the existing frame. If the frame has failed, is distorted or leaks around the edge, replacing the whole rooflight is usually the better answer, and we tell you that.

