What the job costs in Brecon
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Brecon and nearby
Jobs across LD3, NP8 and LD2 are part of our normal cover for Brecon. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Merthyr Tydfil and Ebbw Vale are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
On the day, we cover
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- Old glass taken out safely and removed from site
- Sealed unit ordered to match or improve on the original glass
- Condensation or a failed seal — We confirm whether the mist is inside the sealed unit or on the room-side surface.
- Weight and lifting — We plan how a heavy pane gets onto the roof and into the frame.
How the glass is replaced
The second visit is the quick one. With the new unit made to size, the fitters take the old glass out, check the frame and drainage paths, and set the new glass on packers so it sits square and drains properly. Seals and cappings are renewed where needed, the area is cleared, and you are shown what was done.
Planning and building rules in Wales
Welsh rules differ from England's in one important way: rooflights lose permitted development rights in conservation areas, National Parks, AONBs and World Heritage Sites. Elsewhere on a house, a rooflight that projects no more than 150 mm and stays below the highest part of the roof is usually fine. Building regulations still apply to new openings, replacements we fit go through a building notice because we are not scheme-registered, and the energy limit for rooflights is 2.2 W/m²K. A new Welsh Approved Document L takes effect on 4 March 2027.
What to send us
To price the measuring visit, send a photo of the rooflight from inside showing the misting or crack, one from outside if you can reach a safe viewpoint, and the rough size of the glass. If you know the make or have the original paperwork, include that too, along with the postcode.
Common questions in Brecon
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.
Can you replace just the glass in my rooflight?
Often, yes. If the frame, gaskets and drainage are sound, a new sealed unit can go into the existing frame. If the frame has failed, is distorted or leaks around the edge, replacing the whole rooflight is usually the better answer, and we tell you that.
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Send photos of the problem in Brecon and we will price the visit before you book it.