Bridgend guide prices
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Covering Bridgend means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in CF31, CF35 and CF32, and are happy to quote further out in Porthcawl and Maesteg. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
What we do on the day
- Measuring visit to size the glass and identify its make-up
- Old glass taken out safely and removed from site
- New unit set on packers, then beaded, capped or bonded as designed
- Condensation or a failed seal — We confirm whether the mist is inside the sealed unit or on the room-side surface.
- Matching the glass make-up — We identify the existing glass so the replacement performs at least as well.
How the glass is replaced
The second visit is the quick one. With the new unit made to size, the fitters take the old glass out, check the frame and drainage paths, and set the new glass on packers so it sits square and drains properly. Seals and cappings are renewed where needed, the area is cleared, and you are shown what was done.
Do you need permission in Bridgend?
Welsh rules differ from England's in one important way: rooflights lose permitted development rights in conservation areas, National Parks, AONBs and World Heritage Sites. Elsewhere on a house, a rooflight that projects no more than 150 mm and stays below the highest part of the roof is usually fine. Building regulations still apply to new openings, replacements we fit go through a building notice because we are not scheme-registered, and the energy limit for rooflights is 2.2 W/m²K. A new Welsh Approved Document L takes effect on 4 March 2027.
What to send us
To price the measuring visit, send a photo of the rooflight from inside showing the misting or crack, one from outside if you can reach a safe viewpoint, and the rough size of the glass. If you know the make or have the original paperwork, include that too, along with the postcode.
Common questions in Bridgend
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
Is new glass or a new rooflight better value?
If the frame, gaskets and drainage are sound, new glass is usually the cheaper fix. If the frame is cracked, distorted or leaking at the kerb, a full replacement is better value. After the measuring visit we price both so you can compare.
Send photos of the problem in Bridgend and we will price the visit before you book it.

