Guide prices in Cwmbran
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Cwmbran we cover
Fitters travel to the job, so the address is what counts. In Cwmbran that means postcode districts NP44, NP20 and NP4, and the same teams can just as easily take on work in Pontypool, about 3 miles away, or Risca at roughly 5 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
What we do on the day
- Old glass taken out safely and removed from site
- Sealed unit ordered to match or improve on the original glass
- Joints water tested and the glass cleaned inside and out
- Weight and lifting — We plan how a heavy pane gets onto the roof and into the frame.
- Can the glass come out? — We check whether your rooflight has removable glass or a bonded unit before booking a fitting visit.
How the glass is replaced
On the fitting visit, the room below is protected first. The beads or cappings come off, the old unit is lifted out with suction lifters, and the rebate is cleaned and checked for damage or blocked drainage. The new sealed unit goes in on fresh packers and gaskets, the cappings are refitted and sealed, and the glass is cleaned. Most glass swaps take half a day once the new glass is made.
Regulations for Cwmbran properties
In Wales, a new rooflight opening generally needs building regulations approval, and a replacement needs either a scheme-registered installer's certificate or a building notice to the council. We are not registered with a scheme, so we use a building notice and show the fee on the quote. Rooflights must meet 2.2 W/m²K and roof windows 1.4 W/m²K. Planning is tighter than in England: rooflights are not permitted development in conservation areas, National Parks, Areas of Outstanding Natural Beauty or World Heritage Sites, so we check your address before quoting.
What to send us
To price the measuring visit, send a photo of the rooflight from inside showing the misting or crack, one from outside if you can reach a safe viewpoint, and the rough size of the glass. If you know the make or have the original paperwork, include that too, along with the postcode.
Common questions in Cwmbran
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
Can you replace just the glass in my rooflight?
Often, yes. If the frame, gaskets and drainage are sound, a new sealed unit can go into the existing frame. If the frame has failed, is distorted or leaks around the edge, replacing the whole rooflight is usually the better answer, and we tell you that.
Send photos of the problem in Cwmbran and we will price the visit before you book it.

