Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Cwmbran · NP44 · Gwent

Roof lantern installation in Cwmbran

Glass is heavy, and bigger units get heavy fast. Fitting a roof lantern in Cwmbran means planning how it travels from the delivery vehicle to the roof without chipping an edge or straining a back. Smaller units go up by hand with two fitters. Larger ones may need a hoist, a scaffold loading bay or a crane, and we tell you at quote stage if that applies. Once it is up, the fitting follows the maker's sequence: seat, fix, seal, finish. We take on work like this across Gwent.

Guide price from £3,095 · Supply & fit

Guide prices

About 1 × 2 m

£3,095 – £4,545including VAT at 20%

Aluminium lantern, double glazed, fitted and glazed on a ready upstand

About 1.5 × 3 m

£4,545 – £7,195including VAT at 20%

Mid-size lantern, solar-control glass options

2 × 4 m and over

£7,195 – £11,395including VAT at 20%

Large lanterns, lifting gear on the day

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering NP44 and neighbouring districts

If you also own a property or a business unit in Pontypool, Risca or Newport, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and NP44, NP20 and NP4 sit comfortably within that pattern.

Already bought your unit?

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a roof lantern, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

Included in the work

  • Upstand checked for size, level and square before the kit is opened
  • Frame assembled on the kerb in the maker's set order
  • Glass cleaned and packaging cleared from the roof
  • Lanterns and planning — We check whether your lantern can go in without a planning application.
  • Level, not to a fall — We set or check the kerb level unless your lantern's maker says otherwise.

A typical installation day

Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a roof lantern: one to two days, weather permitting.

Regulations for Cwmbran properties

In Wales, a new rooflight opening generally needs building regulations approval, and a replacement needs either a scheme-registered installer's certificate or a building notice to the council. We are not registered with a scheme, so we use a building notice and show the fee on the quote. Rooflights must meet 2.2 W/m²K and roof windows 1.4 W/m²K. Planning is tighter than in England: rooflights are not permitted development in conservation areas, National Parks, Areas of Outstanding Natural Beauty or World Heritage Sites, so we check your address before quoting.

Before you get in touch

For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as NP44.

Common questions in Cwmbran

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Do I need planning permission for a rooflight in Cwmbran?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in Wales. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

Tell us your postcode, NP44 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Roof lanterns in Cwmbran

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote