What the job costs in Stratford
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
If you also own a property or a business unit in West Ham, Bow or Canning Town, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and E15, E3 and E13 sit comfortably within that pattern.
On the day, we cover
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- Measuring visit to size the glass and identify its make-up
- Joints water tested and the glass cleaned inside and out
- Condensation or a failed seal — We confirm whether the mist is inside the sealed unit or on the room-side surface.
- Matching the glass make-up — We identify the existing glass so the replacement performs at least as well.
How the glass is replaced
The second visit is the quick one. With the new unit made to size, the fitters take the old glass out, check the frame and drainage paths, and set the new glass on packers so it sits square and drains properly. Seals and cappings are renewed where needed, the area is cleared, and you are shown what was done.
Do you need permission in Stratford?
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
What to send us
Photos of the problem glass from inside and out, a rough width and length, and whether the rooflight opens or is fixed are enough to price the first visit. Add the postcode and how the roof is reached, and tell us if more than one unit has misted.
Common questions in Stratford
Can you replace just the glass in my rooflight?
Often, yes. If the frame, gaskets and drainage are sound, a new sealed unit can go into the existing frame. If the frame has failed, is distorted or leaks around the edge, replacing the whole rooflight is usually the better answer, and we tell you that.
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.
Send photos of the problem in Stratford and we will price the visit before you book it.