Guide prices in Ayrshire
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Towns we list in Ayrshire
Coverage in Ayrshire works by postcode, not by distance from an office. Give us the full postcode and we will confirm whether it is standard cover, as it is for most of Scotland, or one of the few remote and island areas handled by arrangement. Either way, you get a written quote before any work is booked, with travel included in the price.
Arran and Cumbrae are covered by arrangement, with ferry and travel costs priced into the quote before you commit.
- Glass replacement in Ayr
- Glass replacement in Irvine
- Glass replacement in Kilmarnock
- Glass replacement in Kilwinning
What we do on the day
- Measuring visit to size the glass and identify its make-up
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- New glazing tapes, gaskets or sealant fitted to suit the frame
- Condition of the frame — We look at the frame closely before committing to new glass.
- Can the glass come out? — We check whether your rooflight has removable glass or a bonded unit before booking a fitting visit.
Rules that apply in Scotland
For Scottish homes: building warrant for new rooflight openings; no warrant for replacing a rooflight complete with its frame, provided it meets the standards, including 1.6 W/m²K; planning permission in conservation areas and listed building consent for listed properties. Outside those, permitted development usually covers house rooflights, but the planning authority has the final word, so we check before you commit.
Common questions in Ayrshire
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.
Is new glass or a new rooflight better value?
If the frame, gaskets and drainage are sound, new glass is usually the cheaper fix. If the frame is cracked, distorted or leaking at the kerb, a full replacement is better value. After the measuring visit we price both so you can compare.

