What the job costs in Hindley
Standard window
Centre-pivot roof window with flashing kit, tiles cut and refitted, inner lining
Larger or top-hung
Bigger or top-hung windows, or two in the same roof
Electric or pair
Electric or solar windows, or a matched pair with blinds
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Hindley and nearby
Distance is rarely the deciding factor. A roof in Wigan, 2 miles from Hindley, gets the same survey, the same written quote and the same fitting process as one in WN2, WN1 and WN3. What changes the price is the job itself: size of unit, roof type, access and lifting. Westhoughton, around 3 miles out, is treated the same way.
What we check on a supplied unit
There are two ways to do this. Supply and fit means we source a pitched roof window that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.
What we do on the day
- Rafters trimmed where the window is wider than the gap between them
- Flashing kit matched to tiles, slates or a recessed fit
- Tiles or slates cut and refitted neatly around the flashing
- Energy limit for roof windows — We check the window's published figures against the energy limit for existing homes.
- Head height and view — We think about how the window will be used from inside before fixing its height.
A typical installation day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a pitched roof window level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day.
Regulations for Hindley properties
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
Before you get in touch
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, WN2 or nearby, confirms travel.
Common questions in Hindley
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
How long does fitting take?
Fitting a pitched roof window into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
For a free, no-obligation quote in Hindley, use the form or call us with the details of your roof.