Guide prices
Standard window
Centre-pivot roof window with flashing kit, tiles cut and refitted, inner lining
Larger or top-hung
Bigger or top-hung windows, or two in the same roof
Electric or pair
Electric or solar windows, or a matched pair with blinds
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Fitters travel to the job, so the address is what counts. In Ponders End that means postcode districts EN3, EN1 and N9, and the same teams can just as easily take on work in Edmonton, about 1 mile away, or Enfield at roughly 2 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Fit-only or supply and fit
If you have bought a pitched roof window yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the flashing kit and the roof pitch range. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
Included in the work
- Rafters trimmed where the window is wider than the gap between them
- Flashing kit matched to tiles, slates or a recessed fit
- Insulation collar and vapour layer fitted to stop a cold edge
- Side slopes and neighbours — We check which slope the window is going on before you commit.
- Flashing to suit the roof — We match the flashing kit to your roof covering before ordering.
A typical installation day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a pitched roof window level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day.
Planning and building rules in England
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Help us quote accurately
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, EN3 or nearby, confirms travel.
Common questions in Ponders End
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Do you cover Ponders End?
Yes. Fitters travel to addresses in Ponders End and the surrounding districts, including EN3. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Get in touch with the details of your Ponders End property and we will explain what the job involves and what it costs.