Guide prices in Kendal
Standard window
Centre-pivot roof window with flashing kit, tiles cut and refitted, inner lining
Larger or top-hung
Bigger or top-hung windows, or two in the same roof
Electric or pair
Electric or solar windows, or a matched pair with blinds
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering LA9 and neighbouring districts
Covering Kendal means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in LA9, LA8 and LA7, and are happy to quote further out in Morecambe and Lancaster. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
What we check on a supplied unit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a pitched roof window, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
What the job includes
- Inside lining fitted and left ready for decoration
- Window frame fixed on its brackets, square and at the right height
- Rafters trimmed where the window is wider than the gap between them
- Energy limit for roof windows — We check the window's published figures against the energy limit for existing homes.
- Head height and view — We think about how the window will be used from inside before fixing its height.
What happens on the day
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A pitched roof window goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take one day.
Do you need permission in Kendal?
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
What to send for a quick quote
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in LA9, and we can price it.
Common questions in Kendal
What if my roof opening is the wrong size for the pitched roof window?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Tell us your postcode, LA9 or close by, and what you want fitted. We will reply with the next steps and a quote.

