Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Yarm · TS15 · County Durham

Pitched roof window installation in Yarm

Rooflight work is weather work. Membranes, primers and sealants all want a dry surface, so a fitting day in Yarm is planned around the forecast rather than pinned to a date regardless of rain. The opening is kept covered whenever it is exposed, and a roof is not left open overnight without a proper temporary seal. That approach applies to every pitched roof window we install, from a new opening to a straight swap or a fit-only job. We cover Yarm, the TS15 district and the rest of County Durham.

Guide price from £845 · Supply & fit

What the job costs in Yarm

Standard window

£845 – £1,395including VAT at 20%

Centre-pivot roof window with flashing kit, tiles cut and refitted, inner lining

Larger or top-hung

£1,395 – £2,045including VAT at 20%

Bigger or top-hung windows, or two in the same roof

Electric or pair

£2,045 – £3,095including VAT at 20%

Electric or solar windows, or a matched pair with blinds

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Distance is rarely the deciding factor. A roof in Thornaby-on-Tees, 3 miles from Yarm, gets the same survey, the same written quote and the same fitting process as one in TS15, TS16 and TS17. What changes the price is the job itself: size of unit, roof type, access and lifting. Stockton-on-Tees, around 5 miles out, is treated the same way.

What we check on a supplied unit

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

On the day, we cover

  • Inside lining fitted and left ready for decoration
  • Flashing kit matched to tiles, slates or a recessed fit
  • Tiles or slates cut and refitted neatly around the flashing
  • Energy limit for roof windows — We check the window's published figures against the energy limit for existing homes.
  • Head height and view — We think about how the window will be used from inside before fixing its height.

From arrival to clean-up

On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a pitched roof window, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.

Planning and building rules in England

England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.

Help us quote accurately

For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as TS15.

Common questions in Yarm

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Will my new pitched roof window leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Send a few photos and your TS15 postcode, and we will put together a written quote for the job.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Roof windows in Yarm

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote