Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Felling · NE10 · Tyne and Wear

Roof access hatch installation in Felling

Rooflight work is weather work. Membranes, primers and sealants all want a dry surface, so a fitting day in Felling is planned around the forecast rather than pinned to a date regardless of rain. The opening is kept covered whenever it is exposed, and a roof is not left open overnight without a proper temporary seal. That approach applies to every roof access hatch we install, from a new opening to a straight swap or a fit-only job. We cover Felling, the NE10 district and the rest of Tyne and Wear.

Guide price from £1,795 · Supply & fit

Guide prices

Entry-level hatch

£1,795 – £2,995including VAT at 20%

Polycarbonate or entry-level hinged hatch on gas struts, fitted to a new or existing upstand

Glazed manual hatch

£3,095 – £4,695including VAT at 20%

Double-glazed hinged hatch on gas struts, upstand and weathering

Electric glazed hatch

£9,345 – £12,595including VAT at 20%

Push-button glazed hatch with rain sensor; electrician's connection quoted separately

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering NE10 and neighbouring districts

Felling and the districts around it, NE10, NE8 and NE9, all sit inside our working area. So does the ground between Felling and Gateshead (1 mile), and on towards Newcastle upon Tyne (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

Already bought your unit?

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a roof access hatch, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

What we do on the day

  • Electric hatches wired ready for the electrician's final connection, quoted separately
  • Hatch fixed and weathered, with the membrane dressed up the upstand
  • Kerb checked or built square, level and to the maker's height
  • Safety at the roof edge — We ask how often people will use the roof and for what.
  • How far the lid opens — We check how far the lid swings open and what it swings over.

From arrival to clean-up

Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a roof access hatch is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Regulations for Felling properties

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Before you get in touch

For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as NE10.

Common questions in Felling

What upstand height and roof pitch does roof access hatch fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

For a free, no-obligation quote in Felling, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Access hatches in Felling

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote