Guide prices in South Yorkshire
Entry-level hatch
Polycarbonate or entry-level hinged hatch on gas struts, fitted to a new or existing upstand
Glazed manual hatch
Double-glazed hinged hatch on gas struts, upstand and weathering
Electric glazed hatch
Push-button glazed hatch with rain sensor; electrician's connection quoted separately
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in South Yorkshire
We work right across England, and South Yorkshire is covered on the same footing as everywhere else. There is no showroom or depot to visit. The survey happens at your property or, for fit-only jobs, from your photos. If your address is remote or reached by ferry, tell us early and we will confirm what arrangement is needed before quoting.
- Access hatches in Adwick le Street
- Access hatches in Barnsley
- Access hatches in Bentley
- Access hatches in Chapeltown
- Access hatches in Conisbrough
- Access hatches in Darton
- Access hatches in Dinnington
- Access hatches in Doncaster
- Access hatches in Fulwood
- Access hatches in Hoyland
- Access hatches in Maltby
- Access hatches in Mexborough
- Access hatches in Rawmarsh
- Access hatches in Rotherham
- Access hatches in Sheffield
- Access hatches in Thorne
- Access hatches in Wath upon Dearne
- Access hatches in Wombwell
What we do on the day
- Gas struts or actuator fitted and adjusted for full opening
- Hatch fixed and weathered, with the membrane dressed up the upstand
- Electric hatches wired ready for the electrician's final connection, quoted separately
- Energy performance of hatches — We check the hatch's published U-value against the limit that applies.
- How far the lid opens — We check how far the lid swings open and what it swings over.
Rules that apply in England
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Common questions in South Yorkshire
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Will my new roof access hatch leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

