Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Plumstead · SE18 · Greater London

Roof access hatch installation in Plumstead

Glass is heavy, and bigger units get heavy fast. Fitting a roof access hatch in Plumstead means planning how it travels from the delivery vehicle to the roof without chipping an edge or straining a back. Smaller units go up by hand with two fitters. Larger ones may need a hoist, a scaffold loading bay or a crane, and we tell you at quote stage if that applies. Once it is up, the fitting follows the maker's sequence: seat, fix, seal, finish. We take on work like this across Greater London.

Guide price from £1,795 · Supply & fit

What the job costs in Plumstead

Entry-level hatch

£1,795 – £2,995including VAT at 20%

Polycarbonate or entry-level hinged hatch on gas struts, fitted to a new or existing upstand

Glazed manual hatch

£3,095 – £4,695including VAT at 20%

Double-glazed hinged hatch on gas struts, upstand and weathering

Electric glazed hatch

£9,345 – £12,595including VAT at 20%

Push-button glazed hatch with rain sensor; electrician's connection quoted separately

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Plumstead and the districts around it, SE18, SE2 and SE28, all sit inside our working area. So does the ground between Plumstead and Woolwich (1 mile), and on towards Abbey Wood (1 mile). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

What we check on a supplied unit

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

Included in the work

  • Opening and upstand sized for a clear climb-through, not just daylight
  • Opening and closing tested and the controls explained
  • Kerb checked or built square, level and to the maker's height
  • Energy performance of hatches — We check the hatch's published U-value against the limit that applies.
  • Clear opening size — We check the hatch's clear opening rather than its outer size.

A typical installation day

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a roof access hatch runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Planning and building rules in England

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Before you get in touch

Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in SE18, and we can price it.

Common questions in Plumstead

Can you replace an old dome without redoing the whole roof?

Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.

How long does fitting take?

Fitting a roof access hatch into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Do I need planning permission for a rooflight in Plumstead?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

For a free, no-obligation quote in Plumstead, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Access hatches in Plumstead

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote