Birmingham guide prices
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Birmingham and the districts around it, B3, B2 and B4, all sit inside our working area. So does the ground between Birmingham and Aston (1 mile), and on towards Smethwick (3 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Your rooflights or ours
If you have bought a new rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
On the day, we cover
- Roof membrane, felt or tiles made good and dressed up the upstand
- Plasterboard reveals formed inside and left ready for skim or decoration
- Survey of joist direction, roof build-up, ceiling void and access
- Cables, pipes and ceiling fittings — We look into the ceiling void for anything in the way of the new opening.
- Warm or cold roof build-up — We find out whether the roof is insulated above or between the joists before designing the upstand.
A typical installation day
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a new rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning and building rules in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Help us quote accurately
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, B3 or a neighbouring district.
Common questions in Birmingham
Will my new rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
For a free, no-obligation quote in Birmingham, use the form or call us with the details of your roof.