Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Redcar · TS10 · North Yorkshire

New rooflight in an existing roof in Redcar

Already bought a new rooflight, or still deciding which one to get? Both are fine. For new rooflight openings in Redcar we either source a suitable unit and install it, or fit the one waiting in your garage. Fit-only jobs are usually priced from your photos and measurements, while supply-and-fit and replacement jobs get a free survey first. Whichever route you take, the opening, the upstand or flashing, and the delivery are checked before anything is fixed down. Properties in TS10 and the surrounding districts are covered on the same terms.

Guide price from £2,295 · Supply & fit, including structure and making good; building control or warrant fees extra

Redcar guide prices

Small fixed unit

£2,295 – £3,345including VAT at 20%

Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration

Medium fixed unit

£3,345 – £4,795including VAT at 20%

As the small unit, with a larger opening up to about 1 × 2 m and additional trimming

Large or opening unit

£4,795 – £7,795including VAT at 20%

Bigger structural work or an electric opening unit

Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

If you also own a property or a business unit in Guisborough, Middlesbrough or Hartlepool, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and TS10, TS11 and TS6 sit comfortably within that pattern.

Buying your own, or letting us supply

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

What the job includes

  • Insulated upstand built square, level and to the maker's height
  • Opening marked out, covering stripped back and the deck cut cleanly
  • Rooflight fitted, sealed and checked for even clearance on every side
  • Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
  • Warm or cold roof build-up — We find out whether the roof is insulated above or between the joists before designing the upstand.

From arrival to clean-up

On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a new rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.

Planning and building rules in England

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Details that speed up your quote

For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as TS10.

Common questions in Redcar

What if my roof opening is the wrong size for the rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Tell us your postcode, TS10 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

New openings in Redcar

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote