Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Deal · CT14 · Kent

New rooflight in an existing roof in Deal

Builders and extension firms in Deal often want the rooflight stage of a project handled by a specialist fitting team. We step in once the roof deck or battens are ready, fit a new rooflight on your upstand or ours, detail it into the membrane or tiles, and leave the opening ready for the plasterer. Homeowners get exactly the same service directly. In each case the job is quoted in writing first, with any access or lifting needs spelt out. Jobs around CT14 and the neighbouring districts are welcome.

Guide price from £2,295 · Supply & fit, including structure and making good; building control or warrant fees extra

Deal guide prices

Small fixed unit

£2,295 – £3,345including VAT at 20%

Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration

Medium fixed unit

£3,345 – £4,795including VAT at 20%

As the small unit, with a larger opening up to about 1 × 2 m and additional trimming

Large or opening unit

£4,795 – £7,795including VAT at 20%

Bigger structural work or an electric opening unit

Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Looking at a property near Deal but not quite in it? We work across CT14, CT13 and CT15 and outwards to Dover, Ramsgate and Broadstairs. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Deal.

What we check on a supplied unit

If you have bought a new rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.

Included in the work

  • Joists or rafters trimmed with new timbers to carry the load around
  • Roof membrane, felt or tiles made good and dressed up the upstand
  • Plasterboard reveals formed inside and left ready for skim or decoration
  • Upstand energy performance — We build the upstand to meet the energy limit for site-built upstands, not just to hold the rooflight up.
  • Warm or cold roof build-up — We find out whether the roof is insulated above or between the joists before designing the upstand.

How a fitting day runs

Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a new rooflight: two to three days, weather permitting.

Planning and building rules in England

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

What to send for a quick quote

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CT14 and we will come back with a quote or a survey date.

Common questions in Deal

Do you offer trade rates for builders and roofers?

We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Planning a new rooflight in Deal? Tell us about the roof and we will come back with a clear price in writing.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

New openings in Deal

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote