Guide prices
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Canterbury and nearby
Fitters travel to the job, so the address is what counts. In Canterbury that means postcode districts CT1, CT2 and CT4, and the same teams can just as easily take on work in Whitstable, about 6 miles away, or Herne Bay at roughly 7 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Buying your own, or letting us supply
There are two ways to do this. Supply and fit means we source a new rooflight that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.
What the job includes
- Roof membrane, felt or tiles made good and dressed up the upstand
- Joists or rafters trimmed with new timbers to carry the load around
- Opening marked out, covering stripped back and the deck cut cleanly
- Upstand energy performance — We build the upstand to meet the energy limit for site-built upstands, not just to hold the rooflight up.
- Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
What happens on the day
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a new rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Do you need permission in Canterbury?
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Before you get in touch
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CT1 and we will come back with a quote or a survey date.
Common questions in Canterbury
Do I need planning permission for a rooflight in Canterbury?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Ask for a quote for your Canterbury roof. Survey dates are offered based on fitter availability once you are happy with the price.