Guide prices in Hampshire
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Hampshire
Coverage in Hampshire works by postcode, not by distance from an office. Give us the full postcode and we will confirm whether it is standard cover, as it is for most of England, or one of the few remote and island areas handled by arrangement. Either way, you get a written quote before any work is booked, with travel included in the price.
- New openings in Aldershot
- New openings in Alton
- New openings in Andover
- New openings in Basingstoke
- New openings in Bishopstoke
- New openings in Bordon
- New openings in Eastleigh
- New openings in Fareham
- New openings in Farnborough
- New openings in Fleet
- New openings in Gosport
- New openings in Havant
- New openings in Hayling Island
- New openings in Hedge End
- New openings in Hythe
- New openings in New Milton
- New openings in Portsmouth
- New openings in Romsey
- New openings in Southampton
- New openings in Southsea
- New openings in Tadley
- New openings in Totton
- New openings in Waterlooville
- New openings in Winchester
- New openings in Yateley
What we do on the day
- Plasterboard reveals formed inside and left ready for skim or decoration
- Survey of joist direction, roof build-up, ceiling void and access
- Roof membrane, felt or tiles made good and dressed up the upstand
- Upstand energy performance — We build the upstand to meet the energy limit for site-built upstands, not just to hold the rooflight up.
- Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
Rules that apply in England
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Common questions in Hampshire
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.

