Guide prices
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Jobs across NW5, NW1 and NW3 are part of our normal cover for Chalk Farm. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Camden Town and Holloway are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
Buying your own, or letting us supply
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
What the job includes
- Roof membrane, felt or tiles made good and dressed up the upstand
- Insulated upstand built square, level and to the maker's height
- Opening marked out, covering stripped back and the deck cut cleanly
- Upstand energy performance — We build the upstand to meet the energy limit for site-built upstands, not just to hold the rooflight up.
- Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
How a fitting day runs
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a new rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes two to three days.
Planning, building control and Chalk Farm
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
Before you get in touch
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, NW5 or a neighbouring district.
Common questions in Chalk Farm
Can you fit the rooflight I bought online?
Yes, fit-only is one of our core services. Send the product link or spec, photos of the roof and rough sizes, and we can usually price it from those. Before fitting we check the delivery for damage, which should be reported to the seller, plus the size against the builder's opening and the upstand height. The product warranty stays with the maker or seller, and our guarantee covers the fitting.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Send a few photos and your NW5 postcode, and we will put together a written quote for the job.