Guide prices in County Tyrone
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in County Tyrone
Fitting across County Tyrone means planning routes, access and lifting as well as the roof itself. Narrow lanes, shared driveways and town-centre parking restrictions all affect how a large unit is delivered and raised to roof level. We ask about these early so the quote reflects them. That approach is the same everywhere we work in Northern Ireland, from single domestic jobs to multi-unit commercial sites.
What's included
- Rooflight fitted, sealed and checked for even clearance on every side
- Insulated upstand built square, level and to the maker's height
- Survey of joist direction, roof build-up, ceiling void and access
- Planning for your roof — We check whether the new rooflight falls within permitted development for your house and nation.
- Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
Rules that apply in Northern Ireland
For a home in Northern Ireland, check planning first: rooflights are excluded from permitted development in conservation areas and within the curtilage of listed buildings, and elsewhere must keep 0.5 m clear of the ridge, eaves and verges. Then building control: a new opening alters the roof structure, so expect a building control application and confirm with your council, and the glazing must achieve WER Band C or 1.6 W/m²K. We check both for your address before quoting.
Common questions in County Tyrone
Does a rooflight need building control approval?
In Northern Ireland a new opening alters the roof structure, so expect a building control application; confirm the position with your council, including for replacements. The new rooflight must meet WER Band C or 1.6 W/m²K. We confirm what applies before you commit.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Do you cover County Tyrone?
Yes. Fitters travel to addresses in County Tyrone and the surrounding districts, including BT postcodes. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.

