Whitstable guide prices
Small frameless
Up to about 1000 × 1000 mm, hidden frame inside the upstand
Medium frameless
Up to about 1000 × 2000 mm
Large frameless
Large single panes, lifting gear on the day
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Fitters travel to the job, so the address is what counts. In Whitstable that means postcode districts CT5, CT6 and CT2, and the same teams can just as easily take on work in Herne Bay, about 5 miles away, or Canterbury at roughly 6 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
What we check on a supplied unit
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
Included in the work
- Glass bedded on the specified tape or sealant and fixed through the concealed frame
- Inside reveal formed so plaster or trim meets the glass cleanly
- Upstand built to the maker's drawing within its stated tolerance
- Tolerance on the upstand — We build frameless kerbs to the maker's tolerance rather than to normal carpentry accuracy.
- How the reveal will look — We agree the finish at the glass edge before building anything.
How a fitting day runs
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a frameless rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day.
Planning and building rules in England
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
What to send for a quick quote
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around CT5. That is enough for a first price.
Common questions in Whitstable
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
What if my roof opening is the wrong size for the frameless rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
What upstand height and roof pitch does frameless rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Planning a frameless rooflight in Whitstable? Tell us about the roof and we will come back with a clear price in writing.