What the job costs in Maesteg
Small fixed
Double-glazed fixed unit up to 1000 × 1000 mm, fitted to a ready upstand
Medium fixed
1000 × 1500 to 1000 × 2000 mm, double or triple glazed
Large fixed
Bigger units, solar-control glass, two-person lift or lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Fitters travel to the job, so the address is what counts. In Maesteg that means postcode districts CF34, CF32 and CF33, and the same teams can just as easily take on work in Briton Ferry, about 7 miles away, or Neath at roughly 7 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Already bought your unit?
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
On the day, we cover
- Unit bedded on the specified sealant or tape and screw-fixed
- Reveal lined and trimmed inside, with the glass left clean
- Membrane, felt or GRP finished to the frame the way the maker shows
- Pitch of the glass — We make sure the glass will sit at the pitch its maker asks for.
- Fixed or opening — We ask whether you need ventilation before you settle on a fixed unit.
What happens on the day
Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a flat rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning, building control and Maesteg
For a Welsh home, start with where the house is. In a conservation area, National Park, AONB or World Heritage Site, a rooflight needs planning permission; outside those, permitted development usually covers one that projects 150 mm or less. Side-facing roof windows within 10.5 m of a boundary must be obscure-glazed and fixed. New openings need building regulations approval, and replacements we fit are notified with a building notice, as we are not registered with a competent person scheme. We confirm all of this for your address.
Details that speed up your quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CF34 and we will come back with a quote or a survey date.
Common questions in Maesteg
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
How long does fitting take?
Fitting a flat rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Tell us your postcode, CF34 or close by, and what you want fitted. We will reply with the next steps and a quote.