Guide prices
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Maesteg
Maesteg and the districts around it, CF34, CF32 and CF33, all sit inside our working area. So does the ground between Maesteg and Briton Ferry (7 miles), and on towards Neath (7 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
What we check on a supplied unit
Your unit or ours, the fitting standard is the same. For supply and fit we choose a rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
Included in the work
- Roof membrane dressed up the kerb and finished under the drip edge
- Internal reveal trimmed or lined, with the protective film removed at the end
- Opening tested where relevant, packaging taken away and paperwork handed back
- Delivery damage and missing parts — We ask you to open the delivery and check it as soon as it arrives, not on fitting day.
- Warranty conditions on your unit — We read the warranty terms that came with your rooflight before we fit it.
A typical installation day
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A rooflight goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take half a day to a day.
Planning, building control and Maesteg
Wales sets energy limits of 2.2 W/m²K for rooflights and 1.4 W/m²K for roof windows, and new rooflight openings generally need building regulations approval. Replacement units are controlled fittings; we are not registered with a competent person scheme, so ours are covered by a building notice to the council. Planning permission is needed for rooflights in conservation areas, National Parks, AONBs and World Heritage Sites. We check which applies and include the fee in your quote.
What to send for a quick quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CF34 and we will come back with a quote or a survey date.
Common questions in Maesteg
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Get in touch with the details of your Maesteg property and we will explain what the job involves and what it costs.

