Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
New Milton · BH25 · Hampshire

Flat rooflight installation in New Milton

Flat rooflight installation in New Milton comes down to what happens around the glass. A good unit sat on a poor upstand, or with the membrane or flashing cut short at the corners, will still let water in. We fit each flat rooflight to the maker's instructions for fixings, packers and sealant, for homes and businesses across New Milton and the rest of Hampshire. That covers supply and fit, fit-only for a unit you already own, and swapping out a tired one. Every job starts with a written quote, so the price and scope are clear before anyone climbs a ladder.

Guide price from £995 · Supply & fit

Guide prices

Small fixed

£995 – £1,495including VAT at 20%

Double-glazed fixed unit up to 1000 × 1000 mm, fitted to a ready upstand

Medium fixed

£1,495 – £2,295including VAT at 20%

1000 × 1500 to 1000 × 2000 mm, double or triple glazed

Large fixed

£2,295 – £4,095including VAT at 20%

Bigger units, solar-control glass, two-person lift or lifting gear

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Looking at a property near New Milton but not quite in it? We work across BH25, SO41 and SO42 and outwards to Christchurch, Bournemouth and Ferndown. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around New Milton.

Your flat rooflights or ours

If you have bought a flat rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.

Included in the work

  • Unit bedded on the specified sealant or tape and screw-fixed
  • Membrane, felt or GRP finished to the frame the way the maker shows
  • Fall confirmed so rain runs off the glass rather than sitting on it
  • Fixed or opening — We ask whether you need ventilation before you settle on a fixed unit.
  • Weight of large panes — We check the weight of the unit against how we will get it onto the roof.

From arrival to clean-up

Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a flat rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Regulations for New Milton properties

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Help us quote accurately

A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, BH25 or a neighbouring district.

Common questions in New Milton

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

Do you offer trade rates for builders and roofers?

We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.

Get in touch with the details of your New Milton property and we will explain what the job involves and what it costs.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Flat rooflights in New Milton

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote