Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Finchley · N3 · Greater London

Flat rooflight installation in Finchley

Glass is heavy, and bigger units get heavy fast. Fitting a flat rooflight in Finchley means planning how it travels from the delivery vehicle to the roof without chipping an edge or straining a back. Smaller units go up by hand with two fitters. Larger ones may need a hoist, a scaffold loading bay or a crane, and we tell you at quote stage if that applies. Once it is up, the fitting follows the maker's sequence: seat, fix, seal, finish. We take on work like this across Greater London.

Guide price from £995 · Supply & fit

Guide prices in Finchley

Small fixed

£995 – £1,495including VAT at 20%

Double-glazed fixed unit up to 1000 × 1000 mm, fitted to a ready upstand

Medium fixed

£1,495 – £2,295including VAT at 20%

1000 × 1500 to 1000 × 2000 mm, double or triple glazed

Large fixed

£2,295 – £4,095including VAT at 20%

Bigger units, solar-control glass, two-person lift or lifting gear

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering N3 and neighbouring districts

Finchley and the districts around it, N3, N12 and N2, all sit inside our working area. So does the ground between Finchley and Golders Green (2 miles), and on towards Friern Barnet (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

What we check on a supplied unit

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a flat rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

What we do on the day

  • Unit bedded on the specified sealant or tape and screw-fixed
  • Lifting gear or extra hands arranged for large and heavy panes
  • Membrane, felt or GRP finished to the frame the way the maker shows
  • Solar gain on south-facing roofs — We ask which way the roof faces and how the room is used before suggesting glass.
  • Pitch of the glass — We make sure the glass will sit at the pitch its maker asks for.

From arrival to clean-up

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a flat rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Planning and building rules in England

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Details that speed up your quote

Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in N3, and we can price it.

Common questions in Finchley

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

What if my roof opening is the wrong size for the flat rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Tell us your postcode, N3 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Flat rooflights in Finchley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote