Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Finchley · N3 · Greater London

Fit-only rooflight installation in Finchley

A rooflight is not finished when the roof is watertight. The inside matters too: the reveal or lining around the opening, the plaster, the trim where it meets the ceiling. Some installers leave that for somebody else. When we quote for fit-only rooflight installation in Finchley, internal finishing is listed so you can see whether it is included or left for your decorator. That way a rooflight looks right from the room below as well as from outside. We cover Finchley and properties throughout Greater London.

Guide price from £445 · Labour only — you supply the rooflight

Guide prices in Finchley

Onto a ready upstand

£445 – £795including VAT at 20%

Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed

With a new upstand

£795 – £1,295including VAT at 20%

Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed

Large or heavy unit

£1,195 – £2,145including VAT at 20%

Extra hands or lifting gear, larger openings, fixed or opening units

Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across Finchley and nearby

If you also own a property or a business unit in Golders Green, Friern Barnet or Muswell Hill, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and N3, N12 and N2 sit comfortably within that pattern.

Already bought your unit?

There are two ways to do this. Supply and fit means we source a rooflight that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.

On the day, we cover

  • Unit bedded on the sealant or tape the maker specifies, then screw-fixed
  • Opening tested where relevant, packaging taken away and paperwork handed back
  • Opening and upstand measured against the maker's drawing, timber to timber
  • Internal versus external size — We check whether your rooflight's quoted size is the hole size or the outer frame size.
  • Warranty conditions on your unit — We read the warranty terms that came with your rooflight before we fit it.

How a fitting day runs

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Regulations for Finchley properties

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Help us quote accurately

A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, N3 or a neighbouring district.

Common questions in Finchley

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Will my new rooflight leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

How long does fitting take?

Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Send a few photos and your N3 postcode, and we will put together a written quote for the job.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Fit-only fitting in Finchley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote