What the job costs in Peterlee
Small fixed
Double-glazed fixed unit up to 1000 × 1000 mm, fitted to a ready upstand
Medium fixed
1000 × 1500 to 1000 × 2000 mm, double or triple glazed
Large fixed
Bigger units, solar-control glass, two-person lift or lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering SR8 and neighbouring districts
Our fitters come to you. For Peterlee that covers SR8, TS28 and TS27, plus nearby Seaham and Hartlepool. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
What we check on a supplied unit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a flat rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
What we do on the day
- Unit bedded on the specified sealant or tape and screw-fixed
- Membrane, felt or GRP finished to the frame the way the maker shows
- Reveal lined and trimmed inside, with the glass left clean
- Fixed or opening — We ask whether you need ventilation before you settle on a fixed unit.
- Ceiling and reveal depth — We measure the depth from the kerb top to the ceiling to plan the reveal.
Fitting your flat rooflight, step by step
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a flat rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning and building rules in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Help us quote accurately
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, SR8 or a neighbouring district.
Common questions in Peterlee
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
For a free, no-obligation quote in Peterlee, use the form or call us with the details of your roof.