What the job costs in Hexham
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Distance is rarely the deciding factor. A roof in Consett, 13 miles from Hexham, gets the same survey, the same written quote and the same fitting process as one in NE46, NE45 and NE44. What changes the price is the job itself: size of unit, roof type, access and lifting. Newburn, around 14 miles out, is treated the same way.
Your rooflights or ours
If you have bought a rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
On the day, we cover
- Check of the delivered unit, glass, fixings pack and instructions before work starts
- Unit bedded on the sealant or tape the maker specifies, then screw-fixed
- Upstand height, level and fall checked, and squareness confirmed across the diagonals
- Access and lifting — We check how the unit gets from your drive to the roof.
- Warranty conditions on your unit — We read the warranty terms that came with your rooflight before we fit it.
What happens on the day
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Do you need permission in Hexham?
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Details that speed up your quote
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in NE46, and we can price it.
Common questions in Hexham
Will my new rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Send a few photos and your NE46 postcode, and we will put together a written quote for the job.