Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Ashton in Makerfield · WN4 · Greater Manchester

Fit-only rooflight installation in Ashton in Makerfield

Rooflight work is weather work. Membranes, primers and sealants all want a dry surface, so a fitting day in Ashton in Makerfield is planned around the forecast rather than pinned to a date regardless of rain. The opening is kept covered whenever it is exposed, and a roof is not left open overnight without a proper temporary seal. That approach applies to every rooflight we install, from a new opening to a straight swap or a fit-only job. We cover Ashton in Makerfield, the WN4 district and the rest of Greater Manchester.

Guide price from £445 · Labour only — you supply the rooflight

Guide prices in Ashton in Makerfield

Onto a ready upstand

£445 – £795including VAT at 20%

Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed

With a new upstand

£795 – £1,295including VAT at 20%

Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed

Large or heavy unit

£1,195 – £2,145including VAT at 20%

Extra hands or lifting gear, larger openings, fixed or opening units

Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Distance is rarely the deciding factor. A roof in Haydock, 2 miles from Ashton in Makerfield, gets the same survey, the same written quote and the same fitting process as one in WN4, WN3 and WN5. What changes the price is the job itself: size of unit, roof type, access and lifting. Golborne, around 2 miles out, is treated the same way.

Buying your own, or letting us supply

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

Included in the work

  • Unit bedded on the sealant or tape the maker specifies, then screw-fixed
  • Internal reveal trimmed or lined, with the protective film removed at the end
  • Roof membrane dressed up the kerb and finished under the drip edge
  • Delivery damage and missing parts — We ask you to open the delivery and check it as soon as it arrives, not on fitting day.
  • Access and lifting — We check how the unit gets from your drive to the roof.

Fitting your rooflight, step by step

Where a job takes half a day to a day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Planning and building rules in England

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Before you get in touch

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around WN4 and we will come back with a quote or a survey date.

Common questions in Ashton in Makerfield

What if my roof opening is the wrong size for the rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

What upstand height and roof pitch does rooflight fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

Got a unit waiting to go in, or need one sourced? Either way, start with your Ashton in Makerfield address and a couple of photos.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Fit-only fitting in Ashton in Makerfield

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote