Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
New Cross · SE14 · Greater London

Fit-only rooflight installation in New Cross

Already bought a rooflight, or still deciding which one to get? Both are fine. For fit-only rooflight installation in New Cross we either source a suitable unit and install it, or fit the one waiting in your garage. Fit-only jobs are usually priced from your photos and measurements, while supply-and-fit and replacement jobs get a free survey first. Whichever route you take, the opening, the upstand or flashing, and the delivery are checked before anything is fixed down. Properties in SE14 and the surrounding districts are covered on the same terms.

Guide price from £445 · Labour only — you supply the rooflight

What the job costs in New Cross

Onto a ready upstand

£445 – £795including VAT at 20%

Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed

With a new upstand

£795 – £1,295including VAT at 20%

Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed

Large or heavy unit

£1,195 – £2,145including VAT at 20%

Extra hands or lifting gear, larger openings, fixed or opening units

Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Coverage in and around New Cross

Looking at a property near New Cross but not quite in it? We work across SE14, SE8 and SE4 and outwards to Brockley, Greenwich and Peckham. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around New Cross.

Your rooflights or ours

Your unit or ours, the fitting standard is the same. For supply and fit we choose a rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.

What we do on the day

  • Roof membrane dressed up the kerb and finished under the drip edge
  • Check of the delivered unit, glass, fixings pack and instructions before work starts
  • Unit bedded on the sealant or tape the maker specifies, then screw-fixed
  • Access and lifting — We check how the unit gets from your drive to the roof.
  • Delivery damage and missing parts — We ask you to open the delivery and check it as soon as it arrives, not on fitting day.

How a fitting day runs

Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A rooflight goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take half a day to a day.

Do you need permission in New Cross?

England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.

Getting a price from photos

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, SE14 or nearby, confirms travel.

Common questions in New Cross

Can you replace an old dome without redoing the whole roof?

Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.

What upstand height and roof pitch does rooflight fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

How long does fitting take?

Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Ask for a quote for your New Cross roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Fit-only fitting in New Cross

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote