What the job costs in Newry
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Newry
If you also own a property or a business unit in Banbridge, Portadown or Craigavon, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and BT35, BT34 and BT32 sit comfortably within that pattern.
Buying your own, or letting us supply
Your unit or ours, the fitting standard is the same. For supply and fit we choose a rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
On the day, we cover
- Unit bedded on the sealant or tape the maker specifies, then screw-fixed
- Opening and upstand measured against the maker's drawing, timber to timber
- Upstand height, level and fall checked, and squareness confirmed across the diagonals
- Upstand height above the roof — We measure how far the upstand stands above the finished roof surface, including any ballast or walkway.
- Delivery damage and missing parts — We ask you to open the delivery and check it as soon as it arrives, not on fitting day.
Fitting your rooflight, step by step
Where a job takes half a day to a day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Do you need permission in Newry?
For a home in Northern Ireland, check planning first: rooflights are excluded from permitted development in conservation areas and within the curtilage of listed buildings, and elsewhere must keep 0.5 m clear of the ridge, eaves and verges. Then building control: a new opening alters the roof structure, so expect a building control application and confirm with your council, and the glazing must achieve WER Band C or 1.6 W/m²K. We check both for your address before quoting.
Getting a price from photos
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around BT35. That is enough for a first price.
Common questions in Newry
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Does a rooflight need building control approval?
In Northern Ireland a new opening alters the roof structure, so expect a building control application; confirm the position with your council, including for replacements. The new rooflight must meet WER Band C or 1.6 W/m²K. We confirm what applies before you commit.
Got a unit waiting to go in, or need one sourced? Either way, start with your Newry address and a couple of photos.

