Holyhead guide prices
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Distance is rarely the deciding factor. A roof in Caernarfon, 19 miles from Holyhead, gets the same survey, the same written quote and the same fitting process as one in LL65, LL64 and LL63. What changes the price is the job itself: size of unit, roof type, access and lifting. Bangor, around 22 miles out, is treated the same way.
What we check on a supplied unit
If you have bought an electric opening rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
On the day, we cover
- Rain sensor positioned where it will get wet when rain starts
- Opening and closing tested, with controls explained at handover
- Unit fitted, sealed and weathered like a fixed flat rooflight
- Rain sensor position — We place the rain sensor where rain will reach it quickly and debris will not cover it.
- Who makes the final connection — We confirm who will connect the rooflight to the mains before booking.
A typical installation day
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for an electric opening rooflight: one day, plus the electrician's connection, weather permitting.
Regulations for Holyhead properties
In Wales, a new rooflight opening generally needs building regulations approval, and a replacement needs either a scheme-registered installer's certificate or a building notice to the council. We are not registered with a scheme, so we use a building notice and show the fee on the quote. Rooflights must meet 2.2 W/m²K and roof windows 1.4 W/m²K. Planning is tighter than in England: rooflights are not permitted development in conservation areas, National Parks, Areas of Outstanding Natural Beauty or World Heritage Sites, so we check your address before quoting.
Before you get in touch
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around LL65. That is enough for a first price.
Common questions in Holyhead
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
How long does fitting take?
Fitting an electric opening rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Tell us your postcode, LL65 or close by, and what you want fitted. We will reply with the next steps and a quote.