What the job costs in Newport
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Newport
Distance is rarely the deciding factor. A roof in Risca, 5 miles from Newport, gets the same survey, the same written quote and the same fitting process as one in NP20, NP19 and NP10. What changes the price is the job itself: size of unit, roof type, access and lifting. Cwmbran, around 5 miles out, is treated the same way.
What we check on a supplied unit
Your unit or ours, the fitting standard is the same. For supply and fit we choose an electric opening rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What we do on the day
- Cable route and controls set up ready for the electrician's final connection, quoted as a separate line
- Wall switch, remote receiver or control box fixed in place
- Opening and closing tested, with controls explained at handover
- Cable length and size — We check the cable run against the maker's limits before planning where the controls go.
- Opening onto a side slope — We check where the opening part will sit if the roof is pitched or the unit faces a neighbour.
From arrival to clean-up
Where a job takes one day, plus the electrician's connection, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then an electric opening rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning, building control and Newport
Welsh rules differ from England's in one important way: rooflights lose permitted development rights in conservation areas, National Parks, AONBs and World Heritage Sites. Elsewhere on a house, a rooflight that projects no more than 150 mm and stays below the highest part of the roof is usually fine. Building regulations still apply to new openings, replacements we fit go through a building notice because we are not scheme-registered, and the energy limit for rooflights is 2.2 W/m²K. A new Welsh Approved Document L takes effect on 4 March 2027.
Help us quote accurately
For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as NP20.
Common questions in Newport
Will my new electric opening rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Do you cover Newport?
Yes. Fitters travel to addresses in Newport and the surrounding districts, including NP20. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Got a unit waiting to go in, or need one sourced? Either way, start with your Newport address and a couple of photos.