Gelligaer guide prices
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Distance is rarely the deciding factor. A roof in Blackwood, 2 miles from Gelligaer, gets the same survey, the same written quote and the same fitting process as one in CF82, CF81 and NP12. What changes the price is the job itself: size of unit, roof type, access and lifting. Pontypridd, around 6 miles out, is treated the same way.
What we check on a supplied unit
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
Included in the work
- Upstand checked or built to suit the unit and its actuator housing
- Rain sensor positioned where it will get wet when rain starts
- Unit fitted, sealed and weathered like a fixed flat rooflight
- Opening onto a side slope — We check where the opening part will sit if the roof is pitched or the unit faces a neighbour.
- Who makes the final connection — We confirm who will connect the rooflight to the mains before booking.
How a fitting day runs
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix an electric opening rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Regulations for Gelligaer properties
Welsh rules differ from England's in one important way: rooflights lose permitted development rights in conservation areas, National Parks, AONBs and World Heritage Sites. Elsewhere on a house, a rooflight that projects no more than 150 mm and stays below the highest part of the roof is usually fine. Building regulations still apply to new openings, replacements we fit go through a building notice because we are not scheme-registered, and the energy limit for rooflights is 2.2 W/m²K. A new Welsh Approved Document L takes effect on 4 March 2027.
Details that speed up your quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CF82 and we will come back with a quote or a survey date.
Common questions in Gelligaer
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Does a rooflight need building regulations approval?
In Wales a new opening generally needs building regulations approval. A replacement must be self-certified by a scheme-registered installer or covered by a building notice. We are not registered with a scheme, so replacements we fit go through a building notice, and the council's fee is shown on your quote.
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
Tell us your postcode, CF82 or close by, and what you want fitted. We will reply with the next steps and a quote.

