What the job costs in Gelligaer
Small fixed
Double-glazed fixed unit up to 1000 × 1000 mm, fitted to a ready upstand
Medium fixed
1000 × 1500 to 1000 × 2000 mm, double or triple glazed
Large fixed
Bigger units, solar-control glass, two-person lift or lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering CF82 and neighbouring districts
Gelligaer and the districts around it, CF82, CF81 and NP12, all sit inside our working area. So does the ground between Gelligaer and Blackwood (2 miles), and on towards Pontypridd (6 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Fit-only or supply and fit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a flat rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Product paperwork handed over and warranty registration explained
- Lifting gear or extra hands arranged for large and heavy panes
- Fall confirmed so rain runs off the glass rather than sitting on it
- Fixed or opening — We ask whether you need ventilation before you settle on a fixed unit.
- Weight of large panes — We check the weight of the unit against how we will get it onto the roof.
A typical installation day
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a flat rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning, building control and Gelligaer
In Wales, a new rooflight opening generally needs building regulations approval, and a replacement needs either a scheme-registered installer's certificate or a building notice to the council. We are not registered with a scheme, so we use a building notice and show the fee on the quote. Rooflights must meet 2.2 W/m²K and roof windows 1.4 W/m²K. Planning is tighter than in England: rooflights are not permitted development in conservation areas, National Parks, Areas of Outstanding Natural Beauty or World Heritage Sites, so we check your address before quoting.
Before you get in touch
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, CF82 or a neighbouring district.
Common questions in Gelligaer
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
Do I need planning permission for a rooflight in Gelligaer?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in Wales. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.