Belfast guide prices
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering BT1 and neighbouring districts
Our fitters come to you. For Belfast that covers BT1, BT2 and BT7, plus nearby Castlereagh and Newtownabbey. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Already bought your unit?
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack an electric opening rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Wall switch, remote receiver or control box fixed in place
- Cable route and controls set up ready for the electrician's final connection, quoted as a separate line
- Opening and closing tested, with controls explained at handover
- Cable length and size — We check the cable run against the maker's limits before planning where the controls go.
- Opening onto a side slope — We check where the opening part will sit if the roof is pitched or the unit faces a neighbour.
How a fitting day runs
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack an electric opening rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day, plus the electrician's connection.
Planning and building rules in Northern Ireland
Northern Ireland has its own rules. Permitted development for rooflights on a house requires the unit to sit below the highest part of the roof, project no more than 15 cm where the slope faces a road, and stay at least half a metre from the ridge, eaves, party wall and verge. It doesn't apply in conservation areas or within the grounds of a listed building. For building control, structural roof alterations need an application, and rooflights must meet WER Band C or 1.6 W/m²K.
Help us quote accurately
For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as BT1.
Common questions in Belfast
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
How long does fitting take?
Fitting an electric opening rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Send a few photos and your BT1 postcode, and we will put together a written quote for the job.